• k1体育 - 十年品牌 值得信赖

    Enterprise News
    FAI from CRC
    2010-02-04 11:20:28
    |
    Visits:

    On 4th February ,FAI for the second order of BC code products was carried out by CRC at our site. The customer checked carefully the documentation i.e. paint mixing parameter, working instruction, painting inspection specification including the samples, 200 pieces of the first batch were passed.

    Relevant news
    友情链接: